Building Authority

Boston Campus Archived Documents

Share |

Boston Campus

Edward M. Kennedy Institute

Request for Qualifications - Trade (Lathing & Plastering) PDF version 

Request for Qualifications - Trade (Lathing & Plastering) Word version

Filed Sub-Bid Tabulation Sheet - Bids Received on 10/10/12

Filed Sub Bid Tabulation Sheet - Electrical Trade Bid Package #2 - JFK Bus Parking Relocation

Request for Bids to Provide and Install New Furniture

Request for Bids to Provide and Install New Furniture - Addendum #1

 

Energy Producing Facility

Request for Proposals for Architectural and Engineering Services

Related Documents  - Energy and Utility Master Plan May 2010
                                New Energy Plant Validation & Optimization Study

Addendum No. 1 to RFP for Architectural and Engineering Services

 

 

General Academic Building No. 1

Request for Qualifications - Trade Contractors (Various) PDF version

Request for Qualifications - Trade Contractors (Various) Word version

Request for Qualifications - Trade Contractors (Various) - Addendum No. 1

List of Prequalified Trade Contractors - Early Bid Package for GAB No. 1

Trade Contractor Bid Tabulation Sheet - Bid Package No. 2

Request for Qualifications for Trade Contractors (Various Trades)

List of Prequalified Trade Contractors - UPDATED

Trade Contractor Bid Tabulation Sheet (Bid Opening - 11/26/13) - REVISED

 

 

Harbowalk and Shoreline Stabilization Project

General Contractor Bid Tabulation Sheet

 

 

Healey Library Roof Replacement and Repairs

Project Manual and Request for Bids - Addendum #1

Related Documents  - Exhibit A (floor plans)

Filed Sub-Bid and General Contractor Procurement Schedule
NOTE: time and location of the pre-bid meeting has been determined

 

New Parking Garage

Request for Proposals for Owner's Project Manager Services

Request for Proposals for Owner's Project Manager Services  - Addendum #1

  

New Residence Hall

Request for Proposals for Owner's Project Manager Services

Request for Proposals for Owner's Project Manager Services - Addendum #1
Please note that the Addendum does not change the due date.  Proposals are due Tuesday, July 30, 2013 as stated in the RFP.

 

Renovations to Existing Academic Buildings

Request for Proposals for Owner's Project Manager Services

Request for Proposals for Owner's Project Manager Services - Addendum #1

Request for Proposals for Architectural and Engineering Services

Project Reports and Resources
  25-Year Campus Master Plan  
  Phase One Space Allocation Plan

     -Appendices to Space Allocation Plan
 
   Space Allocation Plan Study Assumptions 
   Biology Space Allocation Plan Study 
   McCormack Hall & Wheatley Hall: Existing Conditions & Design Implications 
   McCormack Hall: Roof Survey 
   Upgrades for 21 Elevators: Survey and Report 
   Simpson Gumpertz and Heger Roof Condition Studies
     -Final Feasibility Study Report
     -Healey Report
     -McCormack Report
     -Wheatley Report
 
    Campus Architecture and Landscape Design Guidelines
 
    Campus space standards 
    Campus space policy

Addendum No. 1 to RFP for Architectural and Engineering Services

 

  

Tri-Generation Plant

Request for Proposals for Owner's Project Manager Services

Related Documents  - Energy and Utility Master Plan May 2010

Request for Proposals for Owner's Project Manager Services - Addendum #1

 

 

 

Utility Corridor and Roadway

Utility Plant Renovations Phase 

Request for Qualifications for Trade Contractors (PDF Version)

Request for Qualifications for Trade Contractors (Word Version)

Request for Qualifications - Trade Contractors - Responses to Questions

Bid Package #1 - List of Prequalified Trade Contractors

Trade Contractor Bid Tabulation Sheet - Bid Package No. 1 - Utility Plant Renovations

Request for Proposals for Independent Engineering and Commissioning Agent Services

Related Design Documents
-
Conform Set Plants for UCRR
-Design Development Plans for UCRR - Vol 1 (site utility plans only)
-Design Development Plans for UCRR - Vol 2

Request for Proposals for IE/CA - Addendum #1
- Responses to Questions
- EXENDED DEADLINE
 

 

Utility Corridor and Roadway Relocation Project

Request for Qualification for Trade Contractors for the UCRR Bid Package 4

RFQ Trade Contractors for Bid Package #4 -Schedule A thru M (Word version)

List of Prequalified Trade Contractors, Bid Package No. 4

Trade Contractor Bid Tabulation Sheet - Bid Package 4 (Bid Opening 3/26/14)

 

The PDF files on this page require the free Adobe Acrobat Reader.